Skip to content

Horizon West News & Info

Horizon West breaking news and development information. Horizon West's largest news and information source.

Menu
  • Home
  • Patreon Log In
  • Deals & Discounts
  • Event Calendar
  • Development Map
  • Horizon West Villages
    • Government Info
      • Horizon West Map
      • District 1 Information
      • Horizon West Library
      • Horizon West Regional Park
    • About Horizon West
    • Interactive Map
    • Lakeside Village
      • Lakeside Village
      • Westside Shoppes
    • Village of Bridgewater
      • Central Parc at Bridgewater Crossing
      • Windermere Village
    • Town Center – Hamlin
      • Hamlin Town Center
      • Hamlin Plaza
    • Village F
      • The Mark
    • Village H – Hickory Nut
    • Village I
  • About
    • About Us
    • Contact
Menu
Ficquette Road Newsletter 2 Map

Ficquette Road Improvement Update With Reams Road Intersection Enhancements

Posted on January 9, 2023January 9, 2023 by HorizonWestInfo Team
Categories: Lakeside Village, Reams Road, Transportation

Orange County has sent an update to local residents regarding improvements to Ficquette Road. The improvements will take place from South of the Reams Road/Summerlake Park Boulevard Intersection to South of the Ingelnook Drive Intersection.

The road is in the final design phase along with the right-of-way acquisition phase, which began in Summer 2022. Construction is estimated to begin in early 2025 and take approximately 16 months.

LAST CHANCE For $1/mo Ad-Free News!

Cyber Monday Sale!

💥 $1/mo 💥
  • Ad-Free Experience
  • Facebook Group Label
  • Exclusive Patreon Chat
  • Support Local News
Subscribe Now

Roadway improvements include realigning the existing S-curves at the Ficquette Road/Reams Road/Summerlake Park Boulevard intersection, intersection improvements, shared-use trail and sidewalk, lightning, landscaping, and stormwater improvements. The intersection at Reams Road co-inside with the expansion of Reams Road.

Orange County Newsletter Information:

Final Design and Right-of-Way Acquisition Underway

Orange County continues to work on the final design phase for the widening of Ficquette Road from south of the Reams Road/Summerlake Park Boulevard intersection to south of the Ingelnook Drive intersection. This phase of the project includes the roadway engineering and preparation of final construction plans and documents. The right-of-way acquisition phase started in Summer 2022. The construction phase is anticipated to commence early 2025. A third newsletter will be distributed when the project advertises for construction bids.

Project Details

The proposed design includes two 11-foot-wide travel lanes in each direction separated by a raised, grassed median. A shared-use trail will be provided on the west side and a fivefoot concrete sidewalk will be provided along the east side. The project will include realigning the existing S-curves at the Ficquette Road/Reams Road/Summerlake Park Boulevard intersection. Intersection improvements will also be provided at Old Thicket Trace, New Independence Parkway and the Deputy Scott Pine Community Park entrance. New stormwater retention ponds will be required. Additional right-of-way is needed for the roadway and stormwater improvements. Lighting and landscaping will be provided along the roadway corridor.

Ficquette Road Improvement Timeline
Ficquette Road Improvement Timeline

Project information is available at OCFL.net.

Be sure to subscribe to our e-mail newsletter to receive all of the latest updates, or follow us on Facebook, Twitter, Instagram, Youtube, and Reddit.

Want more information on what's being developed? Visit our Horizon West Interactive Development Map to see what's being built!

Have questions about what's being built in Horizon West? Ask us in our Horizon West Development Discussion Group!

Copyright © Horizon West Solutions LLC. All Rights Reserved. HorizonWestInfo.com may be compensated or receive a commission for products or services purchased through links on our website.


Aquatica Orlando
BLACK FRIDAY SALE Buy 1 Get 1 FREE On Your Favorite Citrus!
The Ultimate Steak Experience: Free Shipping

Cyber Monday!

💥 $1/mo 💥
  • Ad-Free Experience
  • Facebook Group Label
  • Exclusive Patreon Chat
  • Support Local News
Subscribe Now

Subscribe To Our Newsletter

 Upcoming Events

Dec 9
10:00 am - 2:00 pm

Mistletoe Market at Hamlin

Dec 16
7:30 am - 10:00 am

Dream Finders Homes 12Ks of Christmas

View Calendar


U-Pack
Discovery Cove

O-Town Compost

Recent Posts

  • Commissioner Nicole Wilson Seeks Re-Election; Challenged By Pam Gould and Austin Arthur
  • Now Open: Simply Capri At Flamingo Crossings
  • 💥Horizon West Black Friday & Cyber Monday Deal List
  • Reminder: No Garbage Collection Thursday, Pickup Days Shift
  • LOOP Cafe Closes In Summerport Village
  • Now Open: Fit2Run Runner’s Superstore at Flamingo Crossings
  • Massive 1,750 Acre Wellness Way Property For Sale Next To Horizon West
  • New Stop Lights & Traffic Calming Measures Planned For Horizon West

Blog Post Tags

429 Avalon Road Betsy VanderLey Chick-Fil-A Clermont coronavirus Costco Disney Firework Alert Flamingo Crossings Flemings Road Hamlin Hamlin Fair Hamlin Phase 2 Hickornut Village Hickorynut Village Horizon West Regional Park Lake Avalon Rural Settlement Lakeside Village library nicole wilson Orange County Orange County Fire Rescue Orange County Library Orange County Public Schools Orange County Sheriffs Office Pam Gould Popstroke Reams Road Silverleaf Starbucks The Mark things to do Town Center transportation Village F Village H Village I village of bridgewater Waterleigh Waterleigh Village Weather Wellness Way Westside Shoppes Windermere Village

Privacy Policy | Terms and Conditions

DMCA.com Protection Status

Login with Patreon

Login with Patreon
©2023 Horizon West News & Info | Design: Newspaperly WordPress Theme
pixel